CV of Martin Polack Page 1 of 4 Martin Polack Over 20 years of experience as full phase Project
Controls Specialist, including strong experience in Construction and Start-up
Planning in LSTK Heavy Construction Projects (LNG Terminal, Petrochemical
Plants, and Offshore Facilities) and Power and Wireless Communication
infrastructure. Key technical competencies § Project Controls § Planning and Scheduling § Progress Monitoring § Risk Analysis § Engineering, Procurement, Construction &
Commissioning & Start-up Planning & Scheduling Highlighted
sector experience § Oil & Gas. Upstream & Downstream § Onshore & Offshore § Infrastructure – Power Nuclear and non-Nuclear
generation § Commercial Facilities Systems and
tools capability § Oracle Primavera: Project Planner (P6) § Risk Analysis (Pertmaster) § Microsoft Office § Microsoft Project § OnePager § Deltek Acumen (Fuse, Risk & 360) § Document Management systems: LiveLink,
Documentum Turner & Townsend Mozambique Gas Development Project (Anadarko) (March 2013 – October 2015) Project Controls consulting services for
Anadarko’s Mozambique Gas Development Project: Supervision of one of three Companies
participating in the competitive FEED work for the Onshore LNG Liquefaction
Plant: Review of Change Orders. Review and approval of Contractor’s Cost
Report, Contractor’s Labour Reports, Personnel Assignment Forms, Travel
Authorizations. Review and approval of Contractor’s Invoices. Approval of
Contractor’s FEED Schedule baseline and review of schedule updates. Update
Owner’s budget, cash flow and forecast. Member of the Technical Evaluation Team for the
LSTK Proposal. Assisting Anadarko in the implementation of
Project Controls Procedures for the Mozambique Gas Development Project.
Developing Procedures for Management of the EPC LNG Terminal Contractor. (EPC
Contract Attachments). Creating the Owner’s Level-2 Schedule. Coordinating
Onshore & Subsea Integration to produce the Commissioning Schedule.
Preparing the Progress Management Plan. Preparing the Schedule Model for
Quantitative Risk Analysis. Fircroft [Jun 2007 - Feb 2013] Exxon Mobil Global Services - Houston Campus
Project – Spring, Texas (May 2011 – February 2013) Member of the Integrated Project Team (IPT)
providing guidance to the Master Scheduler regarding compliance with
ExxonMobil Project Controls and Scheduling Procedures. Performing Schedule Quality Checks on the Project
Master Integrated Schedule (P6 schedule 39,000+ activities). Schedule Interface Manager: identifying
interfaces between each Construction Sub-projects and ensuring the
corresponding schedulers implement the proper relationships between
schedules. Work with Business Managers to develop and implement
the procedures and tools for the Progress Measurement System, to be used by
the Contractor. Validation of Progress values reported by the Contractor. Preparation of Scheduling Reports for the Project
Director (Key Schedule Milestones, variance Report, etc.) Providing General
Consulting Services to ExxonMobil Management regarding planning and
scheduling issues and suggesting the implementation of specific mitigation
work-around Exxon Mobil Development Corporation Golden Pass LNG (GPLNG) - LNG Receiving and
Regasification Facility (June 2007 – April 2011) In charge of supervising Contractor’s planning
and scheduling activities, verifying that good planning and scheduling
practices are in place. Making sure the Prime Contractor Engineering,
Procurement, Construction and Commissioning Groups are integrated with
Project Controls (cost and schedule integration). Prepare internal integrated schedule for GPLNG’s
Commissioning and Operations Groups. Prepare weekly and monthly reports for
the shareholders. Verify that Progress Calculations (earned hours) are
consistent with Field activities Fluor Corporation Operation Canadian Crude, BP Whiting Refinery, Il (November 2006 – May 2007) Integrated Project Management Team (IPMT) Planner
Management of a $3 billion program to add and revamp process units to the
Refinery. In charge of developing the schedule and updating
status and progress of the IPMT activities. The schedule included the
engineering activities at the program level (establishing the standard
drawings and specifications to be used by each of the Projects in the
Program). Coordinating the preparation of integrated schedule reports across
the entire Project as required by the Client. Bechtel Corp [Nov 1997 - Oct 2006] Lead Construction Planner - Oil, Gas &
Chemical Business Unit - Borger Refinery, Borger TX (February 2006 – October 2006) Construction Management Team for a Delayed Coker
Unit/Vacuum Distillation Unit (Conoco Phillips) In charge of reviewing and
validating Contractors schedules. Incorporating Contractors schedules into the
Master Integrated Schedule, performing Critical Path Analysis and
recommending workarounds if necessary. Reviewing Contractors man-power and percent
complete curves to determine plan viability. Establish Contractors interfaces
for mobilization coordination and access to Construction areas Senior Project Controls Engineer / Lead Planning
and Cost Control Engineer - Telecommunications Business Unit - Detroit, MI /
Dallas, TX / Knoxville, TN (May 2003 – January 2006) Installation of new cellular service sites and
installing new technology in existing sites. Created the baseline schedules
for the completion of the three markets. Developed tools in Access and Excel
to track the progress of work. Project Controls Engineer / Lead Construction
& Lead Start-up Planner. Frederick, MD. / Ashland, MS - Magnolia Power
Plant: 3 x 3 x 3 Combined Cycle Power Plant (CTG, STG & HRSG). EPC / LSTK
Project. Construction Planner (October 2000 – May 2003) Participated in the development of the Level III
Construction Schedule (using Primavera, 1000+ activities), including resource
loading (man hours and quantities) and performed the original critical path
analysis. Updated the schedule with input from Construction
Superintendent in a timely fashion, provided feedback to Construction
regarding areas / activities falling behind schedule. Prepared work around
plans caused by the delay in the delivery of the main transformer and the
rebuilding of the cooling towers; impact on the completion milestone was
minimized. Start-up Planner: Developed the Commissioning
schedule with input provided by the representatives of the Combustion and
Steam turbines vendors (GE and Alston). Developed the tool to track the Start Up progress
using quantities (loops, calibrations, motor runs, etc.) Project Controls Area Management - Ciudad del
Carmen, Mexico. PEMEX Cantarell Debottlenecking Project (May 2000 – October 2000) Third Party Supervisors for the installation of
new offshore platforms (wellhead, risers, quarters); and new pipelines.
Responsible for integrating the weekly schedule updates from 6 EPC
Contractors into the Master Schedule, identifying areas of concern (delays)
and requesting acceleration of work. Assisted the Bechtel team in the evaluation of
EPC Contractor's claims for time extension. Prepared a schedule analysis
showing that some portions of the claims had no ground. Assisted the Project
Controls Area Manager in the preparation and review of the Weekly and Monthly
reports required under the Project Management Agreement with the Client Senior Project Controls Engineer - Houston, TX /
Tampico, Mexico. PEMEX Cantarell Debottlenecking Project (November 1997 – April 2000) Third Party Supervisors for the fabrication
of: Two riser platforms, two wellhead platforms, and one Nitrogen
Injection platform. Responsible for Supervising the EPC Contractor’s Project
Controls activities. Reviewed and approved the baseline schedule (CPM)
verifying that it complied with the requirements of logic and resources
loading. Validated Contractor’s weekly progress reports
and schedule updates. Reviewed and approved Contractor’s monthly cash flow
and Estimates. Made independent assessments of time & cost impact of
Change Notices to the EPC Contractors scope. Bufete Industrial (Mexican EPC Contractor) (January 1990 – October 1997) Project Controls Supervisor - Tereftalic Acid
Plant 2 EPC/LSTK/Grassroots (Client: Alpha Group). Tampico Mexico Supervised the development and weekly update of
the Master, intermediate and detailed schedules. Prepared schedule manpower
and quantity progress and performance weekly reports. Also responsible for Construction Cost Control,
Document Controls (ISO 9001), Contract Administration. Project Controls Supervisor - Villahermosa,
Mexico. PEMEX Fractionation Plant and Condensates Sweetening Plant.
EPC/LSTK/Grassroots Supervised the development and weekly update of
the Master, Intermediate and Detailed Schedules. Responsible for Cost
Control, Document Controls (ISO 9001), Contract Administration. Prepared the
Monthly Estimates for payment Project Controls Engineer –Joint Venture with MW
Kellogg – Tula de Allende, Mexico - PEMEX Fluidized Catalytic Conversion Unit
2. EPC/LSTK/Grassroots Review Subcontractors estimates and invoices.
Responsible for Cost Control, Document Controls (ISO 9001), Subcontract
Administration Scheduler - Veracruz, Mexico - CFE Nuclear Power
Plant Laguna Verde Prepare and update fabrication and installation
of pipe and pipe supports schedules |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Fluent |
|
|
|